Herunterladen Inhalt Inhalt Diese Seite drucken

T&S B-2300 serie Installationsanleitung Seite 2

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Before starting the installation, be sure to flush supply lines and shut off water supply.
Step 1:
Take center shank out of body.
Step 4:
Option B: Screw metering escutcheons over c-washers. Tighten
cartridges.
Option B
Step 6:
Remove nuts as shown. Option B: Remove retaining rings from cartridges.
Place center body through center hole into main body. Tighten 3 flange
nuts. Tighten compression nut to seal center body.
Step 2:
Place hanger on body. Add center flange nut to top of
compression nut. Option B: Remove cartridges.
Step 5:
Squeeze hanger loops and allow hanger to drop through center
hole.
Step 7:
Add escutcheons, packing nuts, handles, spout and tighten. Option B: Add
handles, retaining rings, spout and tighten. Turn on water supply and check for
leaks.
Option B
Step 3:
Insert body into deck holes until hanger snaps to top of deck.
Place c-washers under bonnet nuts on side bodies.
Option B
Option B
Swivel to Rigid Gooseneck
Swivel to Rigid Gooseneck
Option: Uninstall and lift
Option
Option B
out gooseneck. Place star
washer into swivel body.
Reinstall gooseneck.
Option B
For models with sidespray:
1. Tighten diverter to center body using
flat head screwdriver.
2. Remove locknuts from hose guide,
place it through existing hole in sink.
Reinstall locknut on the hose guide.
Tighten by hand.
3. Apply Teflon tape to threaded end of
sidespray, insert through hose guide and
attach threaded end of side spray to base
of center body. Tighten with wrench.
4. Turn on water and check for leaks.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis