Herunterladen Diese Seite drucken

Chapter 3 - Packing, Transport And Storage; Lifting And Handling - TECO 302 Serie Bedienungsanleitung

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

PaCKiNG, TraNSPorT aND SToraGE
Only skilled personnel who are familiar with the lift and this manual shall be allowed to
carry out packing, lifting, handling, transport and unpacking operations.
The lift is delivered in many components that appears sub-assembled.
The lay-out is referred to the model.
on-floor installation:
No. 2 base units, each one with a platform and hydraulic cylinders
No. 1 control box equipped with hydraulic unit
No. 1 box containing hydraulic lines, connecting cables, four rubber blocks, stickers and
technical documentation
No. 4 drive-on ramps (2 front and 2 rear ramps) equipped with protective devices to
connect platforms
in-ground installation:
No. 2 base units, each one with a platform and hydraulic cylinders
No. 1 control box equipped with hydraulic unit
No. 1 box containing hydraulic lines, connection cables, four rubber brackets, 40 mm high,
stickers and technical documentation
No. 2 holes covers
If requested, optional accessories are available to satisfy each customer's requirements
(Ref. accessories manual and price lists).
The lift is packed in a single box on a wooden bed, wrapped up in non-scratch waterproof
material and sealed with 2 straps.
The average of the package is 850 kg.
When loading/unloading or transporting the equipment to the site, be sure to use suitable
loading (e.g. cranes, trucks) and hoisting means. Be sure also to hoist and transport the
components securely so that they cannot drop, taking into consideration the package's
size, weight and centre of gravity and it's fragile parts.
76
CHaPTEr 3 -
3.1 Packing

3.2 Lifting and handling

Operator's manual

Werbung

loading

Verwandte Produkte für TECO 302 Serie

Diese Anleitung auch für:

352 serie402 serie