Herunterladen Inhalt Inhalt Diese Seite drucken

Installation And Start-Up - GLATZ FORTANO Aufbau- Und Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für FORTANO:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Installation and start-up

1
Unpacking the parasol
Supplied with:
- parasol
- Crank with stud
- binding (depending on substance class)
- protective cover
- 5 fastening screws (floor fastening)
- 5 support screws
- 2 round-headed screws (standpipe fastening)
- 2 washers
- 3 allen key
- Standpipe cover
- Operating instructions
!
Dispose of packaging material properly
and keep away from children.
Do not make use of defective material.
In the event of any damage, inform the
transport service provider immediately.
2
Placing the parasol down
1. Spread out on a woollen blanket.
2. Place the parasol upon it.
!
Carefully place the parasol on a clean,
horizontal surface. The parasol is very
heavy. Work in a threesome and hold
the parasol securely.
3
Prepare the floor fastening
Place the floor fastening in accordance
with the separate instructions.
Floor fastening weights and wind
resistance
Size
[cm]
300 x 300
400 x 300
* maximum wind speed when it is securely anchored
in the ground.
minimum
maximum
weight
wind speed*
[kg]
[km/h (Bft.)]
120
60 (7)
150
50 (6)
28

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis