Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting / Installation - Sundirect TH600-PRO Installations- Und Bedienungsanleitung

Badezimmer infrarotheizung
Vorschau ausblenden Andere Handbücher für TH600-PRO:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3. Mounting Installation
Note: The kit supplied in the package is designed for mounting vertically on a solid wall. If mounted
onto other types of walls, you will need appropriate fixings (not supplied). Please make sure the wall
is safe to mount.  We highly recommend to have the panel installed by a qualified electrician or
installer authorized by Sundirect. The heater must be at least 20 cm removed from all objects, walls,
etc.; the distance to the floor must be at least 20 cm.
1
3
5
2
WALL
4
WALL
6
Step 1. Mark the position of the
holes according to the mounting
WALL
bracket supplied in the package.
Step 2. Drill holes using a 8mm
drill.
Step 3. Insert the dowels into the
holes.
Step 4. Tight the mounting
bracket on the wall.
WALL
Step 5. Mount the towel rail on
the panel.
Step 6. Mount the panel on the
bracket and move two directions,
and tight the wall spacer to make
the panel securely mounted.
WALL

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis