GATE ALIGNMENT
7
GATE RAIL
INSTALLING THE GATE LATCH
8
2
sc40b
(x2)
(X1)
GATE CORNER
sc35
(x4)
(X4)
1
1. Remove the timber.
Check gate alignment with
2.
the builder's level.
3. If correction is required, open
the nut between the hinge parts,
and move the gate.
4. Finally, tighten the nut in the
correct gate position.
7