Herunterladen Inhalt Inhalt Diese Seite drucken

motormatic 900 BR-V Anleitungs Heft Seite 21

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 28
INSTALLATION
GB
Open package and check that gear motor has not been damaged during
tansport.
Build the fixing platform in cement and drow the anchorage base with the
hooks and the screw nuts (900CPBR); check that it is perfectly horizontal and
that cable's protective covering cross the central hole of the plate.
While you position the barrier, check that there are no obstacles for stroke's
D
movement.
Stops have already been regulated in opening and also in closing (picture 3).
See page 7.
Barrier has counterclockwise opening, if you need to change it, follow the
instructions:
1) Position barrier on opening, switch off the supply and open back counter
2) Release the spring and than unhook it (D)
3) Take off the fixing screw (E) so that you can release the whole spring system
and fix it on the opposite side
900CP-BR
4) Fix screw (F) and couple the spring with the hook (D)
5) Take off the storke and move it 90° from the starting position.
6) Exchange motor's output (Ap.Cp.Ch.) And exchange also limit switch input (fcc-fca)
7) Stretch the spring
8) Check correct operating
F
E
7
8

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

900 br-24

Inhaltsverzeichnis