Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly Preparation - GUTMANN FONDA TYP 2800 ML 830 Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
EN

6. ASSEMBLY PREPARATION

Transport, unpacking, setting up
If the device is brought from a cold environment into the operating room, condensati-
on may occur. Please wait until the device has reached the correct temperature and is
absolutely dry before putting it into operation. The acclimatization time depends on
the temperature difference and the device as well as its construction. However, it
should be at least 12 hours.
Please wear protective gloves during installation to avoid the risk of injury. Before
mounting the hood, prepare the necessary tools.
For the installation of the hood, the customer must provide the prerequisites for a
smooth installation of the hood and cover kitchen appliances.
Prepare a suitable exhaust air duct, if necessary open false ceiling, partition walls,
kitchen block, create openings etc...
50

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Fonda typ 2840/41 ml 830

Inhaltsverzeichnis