Herunterladen Inhalt Inhalt Diese Seite drucken

welltherm PB0210 Bedienungsanleitung Seite 14

Vorschau ausblenden Andere Handbücher für PB0210:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Step 2
Mark the 4 drill positions (6 for PB0910, PB1210, PB1410) by using the drilling template or the
hole distances on the drawing on the page before. Please note the orientation of the heater.
Using a water-level is recommended.
Tip: Before drilling the holes please check if tubes or wires are present in this area. Use a suitable
metal detector.
Step 3
Drill the 4 holes (6 holes for PB0910, PB1210 and PB1410) by using an Ø8mm drill (depth=length of
the dowel).
The depth of the holes should not differ much from the dowel length.
To ensure this demand please mark the drill or use a depth stop.
Tip: To avoid the formation of dust it is recommended to use a vacuum cleaner simultaneously.
Step 4
Push the dowels in the holes and screw the screws in.
Step 5
Fix the 4 (or 6) V-holders with hexagon screws on the heater backside so that they are still turnable. The mouths of the
holders should be orientated in the same direction.
wall mount:
Hang the heater to the wall screws from the top.
Turn the 2 lower holders for 90° as shown in the sketch below.
GB
14

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für welltherm PB0210

Inhaltsverzeichnis