Herunterladen Inhalt Inhalt Diese Seite drucken

Battery Installation; Wing Assembly; Motor Installation - NINCOAIR NH92002 RTF Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 9
NH92002 RTF – TWIN FLYER
11. Turn off your equipment power switch after use.
12. Recycle used batteries after covering the battery terminals with insulation tape or inserting the battery into an individual
polybag.

BATTERY INSTALLATION

WING ASSEMBLY

Place the wing on the fuselage (concave side down) and put the cover on it. Secure with 2 screws
provided. The flaps on the ends and the rest of the fuselage must be installed later, in that order.
Place the ends of the main wing hooks for connecting the aileron (the big front). Insert the flap into the
slot of the joints placed in the main wing.

MOTOR INSTALLATION

Place on the engines lids and screw on both sides. Respect the position, are not covered equally.
Insert the propeller on the engine shafts. Leave a 3-4mm of the roof. Should turn easily.
RUDER AND LANDING GEAR ASSEMBLY
Press the landing gear with the hand. Insert it into the slot and check it is fixed.
NINCOAIR is brand of NINCO DESARROLLOS S.L.
Ctra. de l'Hospitalet 32
08940 Cornella Barcelona Spain
CIF B-60307725 · www.nincoair.com
7

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Twin flyer

Inhaltsverzeichnis