Herunterladen Inhalt Inhalt Diese Seite drucken

Tooping Up The Oil-Dynamic Circuit; Maintenance; Disposal Of The Riveting Tool - FAR KJ 45/S Bedienungsanleitung

Pneumatisch-hydraulisches nietwerkzeug für blindnietmuttern m4/m12
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 28
KJ 45/S
KJ 45/S
TOPPING UP THE OIL-DYNAMIC CIRCUIT (fig. f17-f18)
The oil-dynamic circuit should be topped up after a long period
of work or when there is a power loss of the riveting tool.
Put the riveting tool (not fed) in a vertical position rotating
the knob (M) towards the sign "+" up to the end of stroke,
and remove the plug (I) by means of a 4 mm Allen wrench
(equipped). During this operation check the oil level in order
to avoid any overflowing. Then pour the oil PANOLIN HLP
ISO 32 into the oil container (T) (equipped) which shall be
screwed to its seat on the plug (I).
While keeping the riveting tool in vertical position and starting
air feeding, push the button (D) and make the riveting tool
carry out some cycles until air bubbles inside the container
stop coming out. This condition indicates that the topping
up of the oil has been fully achieved. At this point stop the
air feeding and while keeping the riveting tool in a vertical
position, unscrew and close the oil container (T) and the
plug (I) checking the soundness of the hermetic washer and
repeat all the adjustments for placing the insert as indicated
at page 14-15.
ATTENTION: It is very important to follow the above-
mentioned instructions and use gloves during oil topping up.
If you need to empty completely the hydraulic circuit, you
must put the oil in a suitable container and contact a company
authorized to dispose of wastes.
ATTENTION!
Before disconnecting the compressed air hose,
make sure that it is not under pressure!
ATTENTION: Make sure that the oil filler cap ( I )
is tightened at a torque corresponding to Min. 5
Nm ÷ Max. 8 Nm.
We recommend to use oil PANOLIN HLP ISO 32
DIN 51524-2/HLP or similars.
Revisione - 03
GB

MAINTENANCE

Daily maintenance
- Check that the threaded tie rod is not damaged.
- Check the supply system of the compressed air.
- Check that the stroke of the tool is suitable for the selected
insert to clamp (see the pertaining instructions for adjusting
the stroke, indicated at page 14).
- Check that there are neither air nor oil leakages. In this
case replace possible damaged connectors or seals.
- Check that the supply pressure of the compressed air does
not exceed 7 bar.
Weekly maintenance
- Check the oil level controlling the stroke of the riveting tool.
If necessary fill up for preventing failures of the riveting
tool as indicated (fig. f18).
Overhaul of the riveting tool
It is advisable to carry out a complete overhaul of the riveting
tool after 600,000 cycles or every year.
In this case apply only to centres authorized by FAR S.r.l.

DISPOSAL OF THE RIVETING TOOL

Follow the prescriptions of the national laws for
disposing of the riveting tool.
After disconnecting the tool from the pneumatic
system, disassemble and split all the components
according to the material: steel, aluminium, plastic
material, etc.
Then proceed to scrap the materials in accordance
f17
with current laws.
Date 01-2011
f18
19

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis