Herunterladen Diese Seite drucken

INTER LIGHT IL-MMED3H Anleitung Seite 3

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Commissioning test
If everything is installed, a commissioning test will follow. The battery will be charged for
24 hours without interruption. If this is interrupted, the process starts again. After 24 hours
the duration test of the prescribed 1 hour follows. Equal followed by again
a loading time of 24 hours.
 
Function test
A 5 second function test is performed weekly.
 
Duration test
A full duration test is performed every 13 weeks.
Indication System status by 2 colors LED
Led indication
Green
Green flashing rapidly (0.1sec on / off )
Green blinking slowly (1 sec on / off )
Red
Red blinking slowly (1sec on / off )
Red flashing rapidly (0.1sec on / off )
Green and red
Status
Comments
In operation
Function test in ope-
ration
Endurance test
Loading error
Loose connection / short circuit /
not functioning LED
Battery error
Battery did not meet the
endurance test or funtion test
/ battery defective / incorrect
battery voltage
Charging error
Wrong power supply
Battery active
Emergency lighting on
LED Mini emergency lighting

Werbung

loading

Diese Anleitung auch für:

Il-mmed