SCOPE OF DELIVERY
Fig. 1:
a) Controller (base)
b) Frame
c) Control unit
d) Assembly material (screws)
POWER RESERVE
The integrated batteries keep the clock and program-
settings during a power failure for up to 3h.
Fig. 2: Pull out insulating strip.
The power reserve is activated.
CHANGE BATTERIES
Fig. 3: Disassemble power unit.
Take out batteries.
Put in new batteries of the same type with the right polarity.
After change of batteries: start new programming of the
device.
30
Check completeness and
acceptable condition of
scope of delivery. Don't
start running, if there are
wrong or damaged parts.
GB