Herunterladen Inhalt Inhalt Diese Seite drucken

Checking And Maintenance - Haier HP200M3 series Betriebs- Und Montageanleitung

Wärmepumpenboiler
Vorschau ausblenden Andere Handbücher für HP200M3 series:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Checking and maintenance

- Installation and maintenance of the appliance must be done by a qualified
professional .
- Before working on the appliance,Shut down the machine and cut off the power
supply .
- Do not touch with wet hands.
- Maintenance operations are important to guarantee optimum performance
and extend the life of the equipment.
Checking of the Safety valve
- Operate the safety valve at least once a month to check if it is running
correctly. Otherwise check for blocking and replace the safety valve if necessary.
Checking of the hydraulic circuit
- Check the watertightness of the water connections.
Cleaning of the fan
- Check the cleanliness of the fan one time per year.
Checking of the evaporator
- Because the evaporator fins is very sharp.Risk of injury on your finger.
- Do not damage the fins. Avoid affecting the performance.
- Clean the evaporator at regular intervals using a soft-haired brush.
- If they are bent.Carefully realign the evaporator using a suitable comb.
Checking of the condensates discharge pipe
- Check the pipe cleanliness .
- An obstruction by dust may cause poor condensates flow or even a risk accumulation of
water in the heat pump plastic base.
Checking of the Magnesium rod
- The magnesium anode should be replaced in time, avoid tank corrosion.
- Checking magnesium anode once every 2 years .In poor water areas need to shorten the
time.
Drain the water tank to empty
-Cut off power supply and shut down water inlet valve, then drain the water tank to empty
via the sewage outlet. Please stay away from the sewage outlet if there is hot water inside
the water tank to avoid injury.
27

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Hp250m3Hp250m3c

Inhaltsverzeichnis