English
Assembly and operating instructions Type
multicount 1D4-0-LCD-3P-MID
5 A-active-energy meter, three-phase for current transformer, Fig. 2
Description
The multicount
1D4-0-LCD-3P-MID
active power energy meter for application in 3-phase
power lines for current transformer and neutral
conductor. Depending on the type, the well readable
LCD display offers the reading of additional values like
instantaneous power, total or per phase, as well as
voltages and currents per phase.
Technical data
Connection
Fig. 1
■
diagram
Dimensions
Fig. 3
■
Accuracy class
B, according to EN 50 470-3,
■
Cl. 1 according to IEC 62 053-21
Reference, Maxi-
I
= 5 A, Ima
ref
■
mum, initial current
operating voltage
3 × 230/400 V
■
Tolerance -20%/+15%
Counting range
000000,0...9999999 kWh
■
S0 output
Optocoupler 5 - 30 V
■
(Interface)
Impedance 100 Ω,
pulse duration 30 ms
10 Imp./kWh.
Transmission-
Maximum 1000 m (at 30 V/20 mA)
■
distance
Connections
Conductor cross-section 1,5 - 16 mm
■
Main circuit
Screwdriver Pozi No. 1, slotted
No. 2, breakaway torque 1,5 - 2 Nm
Connections
Conductor cross-section max. 2,5 mm
■
Control circuit
Screwdriver Pozi No. 0, slotted
No. 2, breakaway torque 0,8 Nm
Operating
-10 ... +55°C (noncondensing
■
temperature
according standard EN 50 470)
Indicating elements
(Fig. 4)
T1total (kWh)
Shows total consumption
■
T1part. (kWh)
Shows partial consumption for,
■
this value is resettable
CT
Shows the set
■
current transformer ratio
Select
The transformer ratio can be selected
■
in Menu item Select, in the open
bridge Z1-Z2
P(kW)
Shows the instantaneous power
■
per phase or all phases
U(V)
Shows the voltage per phase
■
I(A)
Shows the current per phase
■
n Imp/kWh
Pulsates according to drawn
■
power
kWh
Shows the unit kWh when the
■
consumption is displayed
L1 / L2 / L3
For P-, U-, I- or Error display, the
■
corresponding phase is displayed
Error
In case of missing phase or wrong
■
current direction. The corresponding
phase is additionally displayed.
26 014
KBR Kompensationsanlagenbau GmbH | Am Kiefernschlag 7 | D-91126 Schwabach
is a compact electronic
6 A, Ist = 10 mA
x =
, 50 Hz
AC
/20 mA,
DC
05.2011
Notes before connecting
1. Do not connect L1, L2 to L3 to N.
2. In order to avoid moisture in the meter due to
condensate build-up, acclimatise the meter at room
temperature for about half an hour before connecting.
Attention!
These devices must only be installed by a professional
electrician, otherwise there is the risk of fire or the risk
of an electric shock.
Operation of the LCD display
The operating menu is shown as a graph on the
figure 4. For setting the transducer value, the bridge
Z1-Z2 must be removed. After setting, this connection
must be restored.
Installation instructions
The three phase energy meter can be attached to a
35 mm rail (EN 60715TH35).
The meter can be used only in installation cabinets.
Declaration of Conformity CE
,
2
KBR Kompensationsanlagenbau GmbH declares at its
own responsibility:
The energy meter multicount
,
2
Manufactured of: Saia-Burgess Controls Ltd. I CH-3280
Murten is in accordance with the following standards:
■ EN 50470 parts 1 and 3
(electronic meter), of October 2006.
■ Directive 2004/22/EG of the European
parliament and of the council regarding
measuring instruments
• Annex I, essential requirements
• Annex MI-003, active electrical energy meters
ESD on equipment side: 13 kV
EC - Declaration of Conformity: 2011
KBR Kompensationsanlagenbau GmbH
Conformity Assessment Body:
Zertifizierungstelle METAS-Cert, Nr. 1259
CH-3003 Bern-Wabern
Signed:
Marcello Grande, Technical Manager
1D4-0-LCD-3P-MID
Subject to change without notice