Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance - Joannes AZ 2,9/L Installations- Und Wartungsanleitung

Leichtölbrenner
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 40
24
Most components can be checked by removing the cover. For head inspection, the component plate must be
dismounted which can be hung on the burner body in 2 positions to allow intervention in the most rationable
way. The motor, transformer and electromagnetic valve are electronically connected to plug/socket, the
photoresistance is inserted under pressure.
ATTENTION:
ensure unit is unplugged before removing cover.
FIG. A
By removing the cover, access is gained to:
condensor-motor, control box, transformer
photoresistance, pump, electromagnetic valve.

MAINTENANCE

Fig. B
By unscrewing the plate fixing pin the burner can be
opened allowing access to the fan, nozz le, electrodes
and preheater.

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Joannes AZ 2,9/L

Diese Anleitung auch für:

Az 2,9Az 2,9 prAz 2,9 pr/l

Inhaltsverzeichnis