Herunterladen Inhalt Inhalt Diese Seite drucken

Wiring Scheme - Joannes AZ 2,9/L Installations- Und Wartungsanleitung

Leichtölbrenner
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 40
18
The wiring scheme to be carried out by technician are:
Power Supply Line
Thermostats Line
Eventual blocking lamp and/or hour-meter
ATTENTION:
Do not invert neutral with phase.
Ensure a good earth connection.
Bridge 3-8 on LOA/LMO base is found only on versions withouth preheater.
INDEX
CO HOUR-METER
FUSE
F
FA ANTI-INTERFERENCE FILTER
PHOTORESISTANCE
FR
IG
MAIN SWITCH
LS
SAFETY LAMP
MA CONTROL BOX TERMINAL STRIP
MB BURNER MOTOR
PB BURNER CONNECTOR
PR PREHEATER
SC PLUG
TA-TC BOILER ENVIRONMENT THERMOSTAT
IGNITION TRANSFORMER
TR
TS
SAFETY THERMOSTAT
Tm MIN. PR THERMOSTAT
VE ELECTROMAGNETIC VALVE

WIRING SCHEME

1
2
2 2 3 4 5 6 7 8
MA
FA
M
MB
VE
CO
9
101112
Tm
PR
TR
PB
B4
S3
T2 T1 N
L1
SC
TS
H
Z
TC-TA
F
LS
IG
N
N
L
N
FR

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Joannes AZ 2,9/L

Diese Anleitung auch für:

Az 2,9Az 2,9 prAz 2,9 pr/l

Inhaltsverzeichnis