Electrical connection, F2030/F2300
Connect heating cable (EB14) to terminal block X3:4
and 7 according to following image:
Cable routing
The following image shows recommended cable rout-
ing from distribution box to condensation water trough
in F2030/F2300.. Transition between electrical cable
and heating cable must occur according to image.
1. Remove side panel.
2. Thread hose clamp on.
3. Route the heating cable through the condensation
water pipe.
4. Remove the condensation water trough.
5. Route the heating cable through the drain pipe
and lead-in.
6. Pull the insulation down slightly, connect the hose
to the drain pipe and tighten the hose clamp.
7. Push the insulation up towards the trough and in-
stall it using cable ties.
8. Reinstall condensation water trough.
9. Stretch the heating cable so that the mark is as il-
lustrated.
10. Route the cable to the distribution box as illus-
trated. (Extend the cable so that removal of the
condensation water trough is possible, i.e. with
some margin.)
11. Use cable ties to secure the heating cable.
12. The distance between the distribution box and the
lead-in to the condensation water trough is ap-
prox.2600 mm.
13. Connect the cable according to the "Electrical
connection" image. (Check fuse according to table.
See Fuse page 20.)
14. Reinstall side panel.