Herunterladen Inhalt Inhalt Diese Seite drucken

Nibe UKV 200 Kyla Benutzer- Und Installateurhandbuch Seite 21

Vorschau ausblenden Andere Handbücher für UKV 200 Kyla:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Installation
The accumulator tank must be installed in an upright
position. The three feet are height-adjustable.
All connections (including connections or holes that are
not used) must be insulated to minimise energy losses.
Dockings
NOTE
These are outline diagrams. Actual installations
must be planned according to applicable
standards.
Volume and flow equaliser, 2-pipe, low temperature, unbalanced and low flow
For multi-occupancy buildings, industrial halls or similar.
When the system volume in the climate system is below 20 l/kW (heat pump output at 7/45 °C) and/or the flow is
choked uncontrolled, a UKV tank is installed as a volume and flow increaser.
UKV 200-300/Kyla | GB
21

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ukv 300 kyla

Inhaltsverzeichnis