Herunterladen Inhalt Inhalt Diese Seite drucken

Installation - Cleveland KEL-25 Bedienungsanleitung

Elektrischer kochtopf für bodeninstallation
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INSTALLATION

GENERAL
Installation of the kettle must be accomplished by qualified electrical installation personnel
working to all applicable local and national codes. Improper installation of product could cause
injury or damage.
INSTALLATION
The first installation step is to refer to the Specification Sheet for detailed clearance and bolting
requirements. Next, carefully cut open and remove the shipping carton. Remove all supports and
fasteners holding unit to the skid.
Position the kettle in its permanent location, and level the kettle by turning the adjustable flanged
feet. Once positioned and leveled, permanently secure the kettle's flanged feet to the floor using
5/16" lag bolts and floor anchors (supplied by the installer). There are three bolts required to
secure each of the flanged feet.
Stationary Models
Remove the screws securing the dome-shaped service cover underneath the kettle and remove
the cover. A wiring diagram is affixed to the inside of cover. Fasten permanent copper wiring to
the three-connection terminal block. Be sure to connect ground wire to the separate ground
terminal connector (ground lug). Slide the cover's slot over the wiring and secure the cover to
kettle with the screws.
Tilting Models
First remove the handwheel by loosening the allen screw. Then remove the two screws at the
front and rear of the console cover and remove the cover. A wiring diagram is affixed to the
underside of the console cover. Feed permanent copper wiring through the cut-out in the bottom
of the console, and fasten to the three-connection terminal block. Be sure to connect the ground
terminal connector (ground lug). Replace the console cover and handwheel.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis