Anhang F: Einbau- und Installationsübersicht
minimum 300 mm free area
mounting drill hole
Maximum ø5.5 mm
Abb. F.1: Maßstab von Bohrschablone = 1:1 (Nedap-Teilenr. 5555426)
Für einen einfacheren Einbau des PowerRouters ist eine Bohrschablone mit beigefügt.
Installation sheet
PowerRouter
Sequence of connecting:
De-energize all energy
sources
1. Connect AC wiring
(Load & Grid)
2. Connect Solar wiring
3. Connect battery wiring
4. Switch on dc-switches
(battery / solar)
5. Switch on ac-switches
(load / grid)
Wiring solar connection:
Connect MC4 string(s)
connectors to solar
terminals
or
Connect string(s) to
optional solar breaker
!
Breaker must have a
minimum rating of
600V dc and 30 A cont.
!
Serial fusing may be
required.
!
Solar irradiated panel
generates high voltage
Abb. F.2: Installationsübersicht (Nedap-Teilenr. 5277256)
Für eine einfachere Verdrahtung des PowerRouters ist eine Installationsübersicht mit
beigefügt.
Drill template PR50SB
mounting drill hole
maximum ø10 mm
!
minimum 300 mm free area
Refer to installation manual for details
Wiring battery
connection:
1. Use large diameter battery
cable, recommended 95m
2. Strip cable isolation
3. Insert cable into terminal
(red to positive terminal,
black to minus terminal)
4. Tighten the cable with hex
driver (6 mm)
Solar
5. Stick self adhesive tempera-
ture sensor on battery
o
on
Verify that the Battery
connections are correctly
wired en properly torqued.
(min 15Nm, max. 20 Nm
optional breaker
using a socket head screw
wrench
It is highly recomended to
use a fuse in the dc-lines
i.e. 300 A
String 1
String 2
RED
Refer to installation manual Nedap part-number 5275962 for details
Mounting bracket
600 mm
Make sure that the wall you choose to mount the Power Router on is sturdy enough to support its weight (20 kg) over
al long period of time and that the wall is plumb. The bracket may be mounted on stone, brick or solid walls. Be sure
to use the appropriate type of mounting hardware for the wall material.
Attach the mounting sheet with tape
exact horizontaly at the wall.
The PowerRouter has a minimum of 300
mm free area at the top and the bottom.
Drill bracket holes.
Drill mounting holes.
Wiring grid / load
RS 232
connection:
25 mm
25 mm
!
Turn OFF the main breaker
2
in the main utility breaker
RS 485
box
1. Connect the AC Line Out
ground wire to the AC Line
Out terminal labelled
2. Connect the AC Line L wire
to the AC Line Out terminal
labelled L
3. Connect the AC Line N wire
to the AC Line Out terminal
+ BATTERY
labelled N
4. Connect the AC Grid/Utility
- BATTERY
ground wire to the AC
Grid/Utility terminal label-
TMPS (RED)
led
5. Connect the AC Grid/Utility
GND (BLACK)
Lwire to the AC Grid/Utility
terminal labelled L
+ SHUNT
6. Connect the AC Grid/Utility
N wire to the AC
- SHUNT
Grid/Utility terminal label-
led N
Verify that all connections
are correctly wired and
properly torqued.
(min. 1.2 Nm. Max 1.5 Nm.)
BLACK
47
minimum 300 mm free area
mounting drill hole
maximum ø10 mm
mounting drill hole
Maximum ø5.5 mm
minimum 300 mm free area
N L
N L
grid
battery
AC
AC
NO
NC
NO
NC
GRID
LINE
OUT
25 A 25 A
25 A 25 A
MAIN
BREAKER
BOX
N L
N L