Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Checking The Maximum Flow Rate; Specification; Dimensions And Connections - STIEBEL ELTRON MEK Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für MEK:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
INSTALLATION

Commissioning

1 Butterfly valve with adjusting screw
2 MEK
3 MED
4 MEB
f Fit the following onto the tap body:
f
- MEK: Pivoting spout
- MED: Shower hose with retainer for hand shower
- MEB: Pivoting arm with shower hose and retainer for hand
shower
www.stiebel-eltron.com
7.
Commissioning
f Thoroughly flush the cold water supply line.
f
f Filling the water heater: Open the DHW valve by pulling the
f
lever forwards and moving it sideways.
f Wait until water flows from the outlet, then switch on the
f
water heater.
1
7.1

Checking the maximum flow rate

Material damage
!
With non-pressurised water heaters, observe the max-
imum permissible flow rate when the tap is fully open
(see chapter "Specification / Data table").
f If the flow rate exceeds the stated value when the
f
tap is fully open, reduce the flow via the butterfly
2
valve in the wall connection.
f For this, remove the cap and turn the adjusting
f
screw clockwise with a screwdriver.

Specification

7.2
3
7.3

Dimensions and connections

MEK
4
200
100
100(70)
MEK | MED |MEB|
G 1/2
190
13

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

MedMeb

Inhaltsverzeichnis