4. HOW TO USE
1. Place the lifting tower over a firm and flat
surface in its working place.
2. Remove the outriggers (H) from their
transport supports (C) and insert them into
their working positions (G) checking that
they are fixed by the safety pins (K). The lon-
gest ooutriggers must be placed on the front,
under the load.
3. Adjust the outrigger stabilisers (J) by tur-
ning the cranks (I) to level the lifting tower.
Ensure it is in a vertical position checking the
bubble level.
4. Place the forklifts (E) in a horizontal po-
sition and secure them with the safety pins.
5. Place the load as close to the lifting tower
as possible.
6. Elevation: Turn the winch handle (B) cloc-
kwise to lift the load until the wished posi-
tion, checking that the safety pins (A) are
activated (T).
7. To avoid lifting tower overloading, do not
separate uneccessarily the line array from the
body of the lift. See fig. 2 (page 23). Follow
loading instructions. See fig. 3 (page 23).
8. Lowering: release the safety pin (A) doing
the action U. To release them, turn slightly
the winch handle to elevate the load. In the
normal working position, the load's weight
does not allow to release the safety pins.
Once the safety pin (A) is unblocked, turn
the winch handle (B) opposite clockwise un-
S
T
U
I
H
J
A
B
C
E
K
F
til lowering the load and the first profile is
completely down. Release the safety pins (A)
and keep on lowering the lifting tower until
the second profile is completely down. Un-
block the safety pin (A) and continue lowe-
ring the lifting tower until it is completely
folded as its minimum height.
9. For the lifting towers' transport is neces-
sary to bring down all the profiles, releasing
the safety pin (A) doing the action U. To fix
the profiles with the safety pins (A) in the
position (S) and fix them with the transport
support (F).

5. MAINTENANCE

1. Periodically check cable status. If the cable
seems to have broken cable wires or crus-
hing, replace immediately with a new one.
Never use the lifting tower with cables in bad
conditions. Only use galvanized steel under
EN 12385-4. Cable maximum load: 2.000kg.
Cable torsion resistance: 1.770N/mm². Cable
diameter: 6mm. Cable composition: 6x19+1.
2. The lifting tower is supplied fully greased
from factory. Nevertheless, periodical grea-
sing is recommended as per use to the crown
gear of the winch, to the threaded bar of the
stabiliser outriggers and the profiles too.
WARNING:
DO NOT GREASE OR LUBRICATE BRA-
KING MECHANISM
Braking disks were greased with a special
heat and pressure resistant grease. No other
product must used to prevent negative in-
fluence on brake functioning.
3. Lifting tower AT-06, must be checked by
an expert once a year minimum as per its use.
4. Only original spare parts must be used to
ensure continued safe use. The user loses all
guarantee rights if spare parts other than the
originals are incorporated or modifies the
product in any way.
5. To request any spare part, contact the
manufacturer or an authorised distributor
within your territory.