6 – SETTING UP
AFTER INSTALLING THE APPLIANCE, WAIT AT LEAST TWO HOURS BEFORE TURNING IT ON.
6.1 – CONNECTIONS
6.1.1 – ELECTRICAL CONNECTION
Electrical connection must be made by a specialised electrician.
If it is necessary to unplug the mains supply, first make sure the circuit board is on OFF
the display.
The manufacture declines all responsibility for damage or accidents caused by failure to observe
such regulations.
ELECTRICAL CONNECTION PROCEDURE
The appliance is supplied by the manufacturer complete with power plug. Just connect the power plug to a socket at the
installation site; the system must be carried out to current regulations.
The electricity supply at the installation site must have the following requisites:
Voltage: 230 Vac
Frequency: 50 Hz
6.2 – PRELIMINARY CHECKS
The installer-electrician must instruct the operator on how to use the refrigerated cabinet correctly and explain the basic
maintenance to be carried out.
METHOD
A specialised technician must prepare the refrigerated cabinet for switching on for the first time, in the presence of the
operator who will use the appliance so that the operator can acquire a minimum working knowledge to help him carry out
allowed routine maintenance and cleaning.
Prior to switching on the appliance, a series of checks and controls must be carried out to prevent errors or accidents
during start up.
Check that the appliance has not been damaged during transport.
Check with special care for any damage to the electrical box, push button control panel, wiring and pipes.
Check that all external power sources have been connected properly.
Check that the machine is perfectly level.
6.2.1 – REGULATION
Regulation carried out by unauthorized personnel may damage the appliance and expose the
operator to serious hazards.
tampering with the appliance and as such null the warranty and relieve the manufacturer of any
responsibility.
ARP_ARG Rev03 05-2013
Check that the power supply voltage given on the ID plate corresponds to that available at the
installation site.
Connections must be made to current regulations; the supply mains must have an efficient
earthing system compliant with electricity regulations in the country; this is a responsibility of
the customer.
Do not make tight bends on the power lead and do not place any object whatsoever on top of it.
Regulation carried out by unauthorized personnel is considered