Herunterladen Inhalt Inhalt Diese Seite drucken

Independence X-Pro Betriebsanleitung Seite 13

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

2.2. Mouting the deployment bag into the harness:
1. Connect the rescue bridle with the harness bridle by
looping the bridles or with a quick link (strength > 2400
daN) and fix the connection to prevent slipping (for
example by a neopren sleeve).
3. Close the first container flap by using the loops with
the help of the packing cords.
Place the handle-deployment bag connection in between
the 2 grommets.
5. Close third container flap with packing cords. Put the
pins through the loops.
2. Rescue systems with a small volume must use the
enclosed volume reduction which can be velcroed in the
bottom of the harness container.
Stow the bridle in the harness container and place the
deployment bag(lines facing to the bottom side) in the
harness container. Loop in the packing cords.
4. Close second container flap with packing cords.
6. Remove all packing cords! Close pin covers and place
the handle in the neoprene pockets (red arrow), secure
handle with a 2 daN seal threat (green arrow).
volume reducer
13

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis