Please noted: This diagram is for reference. The extensions included in the
box may be different from the above diagram display due to different gate
width.
Warning:This package contains small parts and sharp points in an
unassembled state. Keep out of reach of children. Adult assembly required.
Step 1:Measure Opening Width
The thickness of the foundation
line cannot exceed 1 inch
Step 2:Align the bottom of the leveling paper with the horizon, center the
leveling instrument, and then make a mark.
The distance from the bottom of
the iron pipe to the ground must
not exceed 2 inches
- 4 -