MAGNUM Mat
be taken during the installation and on final
completion. These readings should be as
per the technical information (Point 2). Take
measurements both between the resistance
wires and between the resistance wire and
the earth cladding.
Keep this inspection card in the meter
cupboard in a visible place! This forms part of
your guarantee.
8. Installation Instructions
For Self levelling compound: (Point 10):
Unroll the MAGNUM Mat with the heating
cable facing upwards using double sided
adhesive tape. Determine how the matting
must be laid. The glass fibre netting can be
cut between the cable loops and folded over.
Avoid damaging the cable!
When installing in tile cement: (Point 11)
Unroll the MAGNUM Mat with the heating
cable down so that only the glass fibre
netting is visible.
There are many possible variations when
installing.
9. Measuring out the mat
Allow for a distance from the wall of 20 to
30 cm when rolling out the matting in larger
areas. This does not apply to glazed walls
where extra heating is required.
If the MAGNUM Mat is to long, the mat can
be cut into a long length and laid round the
periphery of the mat. The loose cables must
be looped at least 5 cm from each other. They
may not touch or cross each other. Retest the
mat when it has been laid.