Compression Load Cell PR 6201
5

Connection

5.1

General

Caution!
The load cell cable end is protected against contamination and moisture by a
protective sheathing.
Remove the protective sheathing only shortly before connecting!
Protect the cable ends against contamination. No moisture must penetrate into the open cable end.
Do not shorten the load cell cable. Connect the prepared cable end and roll up the remaining cable.
The screen of the load cell cable and the screen of the connecting cable must not be connected
electrically inside the junction box, if connection of both ends is not permissible according to the
regulations for installation in the explosion-hazarded area.
The measuring cables should be kept away from power equipment.
The distance between the measuring cables and the power cables should be at least 1 m.
The measuring cables should be laid in separate cable conduits or steel pipes.
Power cables should be crossed at right angles.
5.2

Load Cell

5.2.1

Standard (Type L, D1/N, D1E/NE, C3, C3E)

Color Code
rd = red
bu = blue
gn = green
gy = grey
EN-16
Installation Manual
+ Supply voltage
+ Meas. voltage / + Load cell output
– Supply voltage
– Meas. voltage / – Load cell output
Screen
Sartorius