wIrING / vErDrAHTUNG / CâBLAGE / ALAMBrADO / CABLAGGIO /
BEDrADING
DFS-1*
X2
UPS
1
X1
(A)
(B)
AC -Grid
info@santonswitchgear.com, www.santonswitchgear.com, NEN-EN-ISO 9001:2008
DFS-1*
+
M
2
3
1
2
X3
(A)
(C)
Note(s):
(A) The DFS-1-* is for 1 string
(B) The AC distribution panel/power box can be fitted with a switch off device
(C) The DFS is equipped with a NO contact which can be connected in series
© copyrights Santon International bv
+
M
X2
UPS
1
2
3
1
2
X1
X3
The DFS-14-* is for 2 strings
The switch off device is not included with the DFS
with all DFS's in an installation to create a feedback loop for signaling purposes.
DFS-1*
X2
UPS
1
X1
(A)
+
M
2
3
1
2
X3