Herunterladen Inhalt Inhalt Diese Seite drucken

Service And Maintenance; Technical Data - Zgonc Yellow Gardenline YGL N.G. 400-2 Originalbetriebsanleitung

Schmutzwasserpumpe
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

With either a fixed conduit.
Or a flexible conduit.
It must be fixed by the handle provided for the
purpose or set at the bottom of the sump (it must
be clean with no impurities or sludge)
If water level is low (long period of drought), be
careful to ensure that any impurities or sludge,
after drying, do not prevent the pump from
starting up. Consequently, you must make sure
that the site where the pump is installed is clean
and run the pump from time to time.
The appliance can only be used at the upward
position.
Cleaning the turbine
(Remove the plug from the power outlet
before cleaning operations start)
If there are heavy deposits in the pump body, the
lower part must be dismantled as follows:
1. Remove the screws from the lower side of the
suction basket.
2. Detach the suction basket from the body of the
pump.
3. Clean the pump with clean water.
Setting the switch point
The float switch point can be set by adjusting the
notches.
Check the following points before switching on:
·The float switch must be installed so that the
switch point level can be reached easily with very
little effort. Make sure of this as follows: immerse
the pump in a container full of water and lift the
float switch carefully by hand, then lower it. You
can thereby check that the pump starts and stops.
·Make sure that the gap between the head of the
float switch and the float switch anchorage device
is not too small. If the gap is not wide enough,
perfect operation is not guaranteed.
·Concerning adjustment, make sure that the float
switch does not touch the floor before the pump
has stopped. Warning! Risk of running dry.
·To modify the starting level, slide the float cable
into the notch provided for the purpose on the
handle.
Quick Mode Change (B1, B2)
The pump can be set at 3 particle size mode
,1mm, 8mm and 35mm.
On delivery, the pump is set to 1mm particle size
position.
Step 1: Hold the disk (2) and pull out the rotary
disk(3).
Step 2: Turn the rotary disk (3) to the right or
to the left until it reaches the desired clearance
position (see the arrow marking (4) on the rotary
disk (3) ).
The 3 particle size are labeled with a height scale
on the base(1) and repeated (see right figure).
Step 3: Loose the rotary disk (3) back to the pump
base (1).

Service and Maintenance

- Before performing any work on the equipment,
pull the power plug.
- Use a damp cloth to clean the plastic elements.
Do not use any cleansers, solvents, or pointed
objects.
Check the functioning of the oat switch every
three months.
Remove any impurities in the pump casing and
any deposits on the oat switch with clear water.
Clean the bottom and walls of the shaft every 3
months.

Technical Data

Mains voltage:
Power frequency:
Power consumption:
Max. discharge flow rate:
Max. delivery height:
Submersion depth:
Foreign matter up to:
8
230 V~
50 Hz
400 W
7500 l/h
5 m
5 m
1/8/35mm mm

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis