Herunterladen Inhalt Inhalt Diese Seite drucken

Operation - Ayce CG500 WER011 Bedienungsanleitung

500 w glas-heizkörper
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Fig. 10
Fig. 12
6.
Screw and fi x the 4 decorative covers (fi g. 13).
Caution: Double check the safe distance according to the drawing in fi g. 2
after fi nishing the assembly.
Fig. 11
Fig. 13

OPERATION

1.
Introduction to Control Panel (fi g. 14):
E
D
Fig. 14
A
Main Power Switch
B
" " Start-up Button
C
" " Power Up Button
D
" " Power Down Button
E
Infrared Receiver
F
Power Indicator
2.
Start-up and Power Selection:
1. Connect to the power socket, press power switch A, then the heater is on
stand by.
2. Press B " ", the power indicator is on, and the heater is working.
3. Press " " or " ", to set the working power of the heater.
5 heat settings: 1st is the lowest (approx. 60 % of rated power),
while the 5th is the highest (100 % of rated power).
4. When the heater is working, press B " ", then the heater stops.
Press power switch A to switch off the heater.
52 | 53
F
A
B
C
GB

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis