Herunterladen Inhalt Inhalt Diese Seite drucken

Reflecta CrystalLine Rollo Bedienungs-/Montageanleitung Seite 9

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

Recycling information
The following symbols are used in these operating instructions or on the
packaging.
Dispose of the packaging according to type. Use the local options for
collecting paper, cardboard and light packaging (applicable in the European
Union and other European countries with systems for the separate collection
of recyclable materials).
Mounting / fixing the projection screen
The projection screen can be mounted on the ceiling or on the wall. The choice of
wall plugs and screws must be selected according to the existing substrate
(masonry, concrete, wood, metal, etc.). The specifications of the screw and anchor
manufacturers must be observed. If you have any questions, please contact the
relevant specialist dealer.
reflecta GmbH
Merkurstr. 8
72814 Eutingen
Germany
www.reflecta.de
mail@reflecta.de
A: 300cm models
B: 160, 180, 200, 200 & 240cm models
Hole spacing for ceiling mounting: 35mm
Hole spacing for wall mounting: 26mm
9
Inhaltsverzeichnis
loading

Inhaltsverzeichnis