Content of delivery:
4x screw
Wall mounting
Operating the mounted projection screen
To fully extend the projection screen, pull down on the bracket of the weighting
rod. As soon as you see the upper horizontal black border on the screen, pull it
about 15 cm further and slowly raise the screen. After about 5-10 cm, the roller
mechanism engages and the projection screen is ready for use. The screen must
not be pulled out beyond the stop mark at the top edge of the screen. To retract
the projection screen again, pull the screen fabric down by approx. 10 cm on the
bracket of the weighting rod and guide it upwards by hand at a rapid and even
speed until the screen fabric has completely disappeared into the tube.
CAUTION: Do not allow the screen to move upwards uncontrollably to avoid
damaging the housing and the screen. This does not apply to screens with a soft
lift mechanism.
4x dovel
10
2x nut plate
Ceiling mounting