Herunterladen Diese Seite drucken

CIARRA CBCW6102 Bedienungsanleitung Seite 12

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation
5) Determine the maximum chimney installation height according to
the actual scenario and mark the chimney installation
locations along the center line of the Installation Diagram.
6) Remove the Installation Diagram, drill the holes that have been
marked on the wall with an Electric Drill (8mm drill), and hammer
the Wall Plug into the wall.
COMPONENTS:
Part 1: Wall Plug X 9
Chimney
installation
locations
Wall Plug
10

Werbung

loading

Diese Anleitung auch für:

Cbcb6102Cbcs6102Cbcb9102Cbcw9102Cbcs9102