Herunterladen Diese Seite drucken
Fronius Primo GEN24 Plus Schnellstartanleitung
Vorschau ausblenden Andere Handbücher für Primo GEN24 Plus:

Werbung

Quick
Start Guide
Fronius Primo GEN24 Plus
Fronius Smart Meter
BYD Battery-Box Premium HVS/HVM
LG FLEX
42,0410,2652
014-25062024

Werbung

loading

Inhaltszusammenfassung für Fronius Primo GEN24 Plus

  • Seite 1 Quick Start Guide Fronius Primo GEN24 Plus Fronius Smart Meter BYD Battery-Box Premium HVS/HVM LG FLEX 42,0410,2652 014-25062024...
  • Seite 2 EN: WARNING! Operating the equipment incorrectly or poor workmanship can cause serious injury or damage. The inverter may only be installed and commissioned by trained personnel acting in accordance with the technical regulations. Before working with the device, en- sure that you have read and understood all the documents provided (both hard copies enclosed with the product and documents provided online).
  • Seite 3 HU: FIGYELMEZTETÉS! A hibás kezelés és a hibásan elvégzett munka súlyos személyi sérüléseket vagy anyagi károkat okozhat. Az inverter telepítését és üzembe helyezését csak szakképzett személyzet végezheti a műszaki rendelkezések keretében. A készülékkel végzett munka előtt az összes mellékelt, nyomtatott és online rendelkezésre bocsátott dokumentumot el kell olvasni és meg kell érteni! A fénynek kitett PV-modulok feszültséggel látják el az invertert.
  • Seite 4 Solcellsmoduler som utsätts för ljus levererar spänning till växelriktaren. Detta dokument beskriver inte alla olika systemkonfigurationer. Operating Instructions Fronius Primo GEN24 Fronius Primo GEN24 3 - 6 kW / 3 - 6 kW Plus 8 - 10 kW / 8 - 10 kW Plus manuals.fronius.com/...
  • Seite 5 Switching OFF inverter Connecting battery to inverter CU-Wire min: 75°C / 167°F N' N' max. 9 mm 12 mm Ø4-10 mm² max. 7 mm max. length Manufacturer manual Connecting Smart Meter TS 100A-1 Connecting Smart Meter 63A-1...
  • Seite 6 Connecting BCU BYD Battery-Box Premium HVS/HVM ATTENTION Do not connect earth (PE) to the inverter. Setting up Terminating Resistor Closing & Commissioning R 120 Modbus 1 RS 485 Inver Activated Modbus 0 Steps 9a / 9b Parallel Modbus 0 / 1 Modbus 0 / 1 (min.
  • Seite 7 Storage type 11.0 13.8 16.6 19.3 22.1 Number of battery modules Number of battery modules Fronius Primo GEN24 Plus Fronius Symo GEN24 Plus Battery parallel operation* Battery parallel operation* * Max. 3 batteries with the same capacity can be combined.
  • Seite 8 Connecting BPU LG FLEX NOTE! Earth (PE) can be connected to the inverter. Setting up Terminating Resistor Closing & Commissioning Modbus 1 Modbus 0 Steps 9a / 9b LG RESU Monitor Modbus 0 / 1 Modbus 0 / 1 (min. CAT 5) (min.
  • Seite 9 Login open access point open access point Login Skip Login Skip Skip Inverter Fronius Smart Meter LG FLEX TS 100A-1 63A-1 Twisted Pair Shield LG FLEX Storage type 12.9 17.2 Number of battery modules Fronius Primo GEN24 Plus...
  • Seite 10 MONITORING & DIGITAL TOOLS Fronius International GmbH Froniusstraße 1 4643 Pettenbach Austria contact@fronius.com www.fronius.com Under www.fronius.com/contact you will find the adresses of all Fronius Sales & Service Partners and locations.

Diese Anleitung auch für:

Smart meter