Herunterladen Diese Seite drucken

Kesser K-PSB-01 Bedienungsanleitung Seite 9

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
9
The control unit can also be used for 3-phase or single-phase connections with currents higher than 10A
by means of an auxiliary contact. In this case, the electrical connections must be made according to
the diagram in figure④.
Starting
1. make sure that the pump is properly prepared, then slowly open the tap.
2. Connect the control unit to the power supply. The LED for the voltage indicator will light up (POWER).
3. The pump will start automatically and in a period of 20-25 seconds the pressure indicator will show the
maximum pressure of the pump. During operation, the corresponding LED(ON) will light up. 4.
Close the tap shown at point 1. After 7-9 seconds the pump will stop. The LED (POWER) for voltage
indication will stay on. Any problem that occurs is due to incorrect preparation of the pump.
www.eshopping.de
Hergestellt für Dilaw Warehouse GmbH // Fuggerstraße 15a // 48165 Münster // Germany

Werbung

loading

Diese Anleitung auch für:

K-psb-02