5. Installation
ATTENTION
Installation and first commissioning shall be carried out only by professionally qualified and
approved staff
During all installation procedures, make sure that the equipment is not connected to the
mains.
The device shall not be installed in bathrooms and/or laundry rooms.
The device cannot be ducted.
During installation or when servicing the product, you must carefully follow the rules indicated in
the manual, observe the instructions on the product, and take all necessary precautions. Failure
to comply with the rules can result in hazardous situations.
The installer must always ensure that the wall where the product is fixed is sufficiently solid,
stable and has an even planar surface, so as to ensure secure fixing and vibration-free
operation.

5.1 Electrical connections

The installation and electrical connection of the device must be carried out by qualified
personnel and in compliance with the laws in force in the country in which the installation is
performed.
Verifying whether the power supply corresponds to the nominal data of the device (voltage,
phases, frequency).
The power supply line must be equipped with a protection circuit breaker compliant with the
regulations in force.
Cable cross-section must be adapted to the regulations in force.
Before commencing any operation, ensure that the power supply is disconnected and take
appropriate measures to ensure that it is not enabled without the operator's knowledge.
The product must be connected to the mains to supply the power necessary for its correct
operation.
The maximum cable cross-section is 1.5 mm.