• The floor should be able to sustain the weight.
• Install the bathtub according to the drawing
• Draining: A draining system shall be planned for the overflow. It's
recommended to position the draining hole as shown in the below
drawing. If not, the draining hole shall be within 200mm around the
ideal position and the diameter shall be less than 50mm. (Point D in
the drawing)
• Maintenance zone: Please leave a space of 500mm or more around
the bathtub for future maintenance. Do not install any fixed objects in
this area. (Point E in the drawing)
Product name
Voltage
Bathtub
220-240V~
EN
DETAILS OF THE BATHTUB
iNSTALLATION
TECHNICAL DATA
Frequency
50Hz
• Electrical connection: Warning: connect the three conductors of the
supply cable to a connection box IPX5 in respecting the polarities as
following:
- Live: Brown
- Neutral: Blue
- Earth: Yellow/Green
• If you are not sure, it's recommended to ask a qualified electrician
for help.
Power
380w
1. Drain hole
2. Light switch
3. Bubble switch
4. Overflow slit
5. Colored lamps
IP
Water pressure
X5
0.2-0.6MPa
9