Herunterladen Diese Seite drucken

spalina TAO Bulle BT-61106B Montageanleitung Seite 10

Werbung

• Adjust the screws of the bottom stands to balance the bathtub body.
Connect a drain pipe (not supplied) to the drain hole of the bathtub then
connect the pipe to a drain hole in the ground. You may use some glue, if
necessary. Follow the below drawing for operation.
• Fill the bathtub first (don't use too hot water)
Don't press the button A to start the bubble massage until the water
in the bathtub is higher than 5cm
Press the button B to control the lamps.
• Disconnect the bathtub before cleaning.
• Clean with soft cloth and light detergent.
• Note: Do not use rough tool or sanded detergent with chemical dissolvent to clean the bathtub.
• If there is a scratch on the bathtub, polish lightly with a sandpaper, apply toothpaste and then clean with soft cloth.
• The lime scale or dirt on the surface can be cleaned with light acid detergent (such as lemon juice) or heated wax. Wipe with
soft cloth in the end.
• Do not wipe the chromed parts too often.
• Don't strike or scratch the surface.
PROBLEMS
The bathtub is uneven
Water pipe leakage
10
EN
DRAINING
OPERATION OF THE BATHTUB
CLEANING
CAUSE
The screws of the foot stand are not
well placed
Seal failure
Screw unlocked
Joint disconnected
Balance
Drainage
Drainage Pipe
SUGGESTIONS
Adjust the screws
Change it
Lock it
Reconnect it

Werbung

loading

Verwandte Produkte für spalina TAO Bulle BT-61106B