Herunterladen Diese Seite drucken

led2work TUBELED 25 RGB-W Betriebsanleitung Seite 10

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
4 | Assembly / Mounting
Check the LED light before installation to ensure it is complete and shows no signs of damage. Do not use the light or
accessories if they are damaged, as there is a risk of injury.
The LED luminaire comes fully assembled. The light is intended for mounting in optional mounting angles. As option there
are this mounting accessories:
TUBELED_25 mounting angles, aluminium, pair, light adjustable 60°
TUBELED_25 mounting angles, aluminium, pair, light adjustable 60° with magnet
TUBELED_25 mounting angles, aluminium, pair, light adjustable 180°
TUBELED_25 mounting angles, aluminium, pair, light adjustable 180° with magnet
5 | Connection
Suitable connection material, cables and accessories can be found in the accessory range of LED2WORK.
PIN assignment of the M8 connector is as follows:
PIN allocation
PIN 1
= 24V DC
PIN 2
= 24V DC
PIN 3
= GND
PIN 4
= 24V DC
PIN 5
= 24V DC
10 | BA TUBELED_25 RGB-W . BA 01/2024
When mounting the light, make sure that the luminaire is fastened securely and stably. If
the luminaire falls down, its weight poses a risk of injury!
Schematic drawing of M8 plug
LED colour:
green
LED colour:
blue
LED colour:
red
LED colour:
white
Further colours can be displayed by gating two or three PINs simultaneously. Do not
operate the white light colour simultaneously with the coloured light channels.
Get in touch with us for more information.
The light is not equipped with a ON/OFF switch. Usually you switch the light ON or OFF
via external switches of machines or systems.
Product no.
210200-23
210200-24
210200-25
210200-26

Werbung

loading