Herunterladen Diese Seite drucken

The Pure Company LazerLite Complete 720W Benutzerhandbuch Seite 6

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

5. Product Installation
Preparation for installation
• Refer to your light plan. Arrange the place for the fixture to be mounted. Prepare appropriate
"hangers" or any other tools to hang the fixture.
• Take caution when handling light bars. Ensure the LED array does not come in contact with
sharp objects or force that may damage the diodes. Unbox and unfold the fixture, then place it
EN
on flat, stable surface.
• Bring any additional tools and/or hardware that may be required to mount the fixture.
• Switch off the main voltage.
ES
Fixture installation
• Fasten mounting bracket on LED light strip by 4 screws. (A)
FR
• Fasten Power Supply on mounting bracket by 4 screws. Only connect to Digital Ballast (Never
connect directly to mains input). (B)
• The LED fixture comes equipped with 8 hanging points. Use Rope Ratchet to pass through the
IT
hanging point of the LED fixture, and then fix the other end of Rope Ratchet on the ceiling of the
greenhouse. (C)
• Distribute the fixture weight evenly so fixture hangs level. Upwards and downwards according to
your crop height. (D)
DE
• The product is equipped with a power cord. Firstly connect the fixture with a power cable. Only
then plug the power cable into the electrical socket, and you are ready to go
A
C
6
B B
D

Werbung

loading