Herunterladen Diese Seite drucken

4rain 4.000 L Montageanleitung Seite 20

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

The entire system must be inspected at least every three months for leaks, cleanliness and stability.
Maintenance should be performed at intervals of about 5 years on the entire system. Here, all system
parts are to be cleaned and inspected with regards to proper function. Maintenance should be carried out
as follows:
Empty tank completely
Check that all mounted parts are firmly fitted
info@4rain.eu
www.4rain.eu
7.
Inspection and maintenance
4rain – A trademark of Otto Graf GmbH
20 / 40

Werbung

loading

Diese Anleitung auch für:

295200