Herunterladen Diese Seite drucken

Hach AS1000 Bedienungsanleitung Seite 9

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 18
Instrument connections
Connect the power supply, the rotating module, the magnetic stirrer and the PC to the rear panel of
the instrument. Refer to
Figure 3 Instrument connections
1 Magnetic stirrer connection
2 Rotating module connection
Installation
Explosion hazard. The instrument is not approved for installation in hazardous locations.
Fire hazard. This product is not designed for use with flammable liquids.
Chemical exposure hazard. Obey laboratory safety procedures and wear all of the personal protective
equipment appropriate to the chemicals that are handled. Refer to the current safety data sheets
(MSDS/SDS) for safety protocols.
Multiple hazards. Only qualified personnel must conduct the tasks described in this section of the
document.
Figure 3
for instrument connections.
3 External power supply
connection
4 PC connection
D A N G E R
D A N G E R
W A R N I N G
C A U T I O N
5 Connections label
English 9

Werbung

loading