28 | VAS 6430 | Product description
5.5.5
Dismantling adjustment device 6430/1
i
Refer to Installation/erection
5.5.6
Installation
Other items
The following additional items are required for installing
the stationary base frame 6430/7:
R
Hammer drill
R
Concrete drill bit (dia. 6, dia. 8)
R
Spirit level (1 mm accuracy)
R
Measuring tape
R
Set of Allen keys
R
10 mm box wrench
!
As they are fixed to the workshop floor, the rails
represent a greater tripping hazard.
1. Align the base frame as specified.
2. Pre-drill the left side (refer to hole pattern) to dia. 6.
3. Enlarge the pre-drilled side to dia. 8.
4. Fit the connectors as specified by the manufacturer.
5. Screw on the rail hand-tight.
6. Slide the base frame to the first drilling location.
7. Perform items 2–5 for the right side.
 Check freedom of movement.
8. Perform diagonal and vertical levelling until the
tolerance range is attained.
i
When pre-drilling, the base frame has to be moved to
the corresponding drilling location.
Fig. 22: Stationary base frame
Fig. 23:
Stationary base frame with rails
1 Wedge
|
1 690 386 012
2013-09-24
i
Further shims may be required under the rails.
Fig. 24:
Levelling
Fig. 25:
Stationary base frame with stand
1 End stop
Re-positioning end stop
1. Remove the cap.
2. Screw out the cheese head bolt.
3. Screw in the cheese head bolt with packing plate.
Fig. 26:
Stationary base frame with cross laser
Centrally align the stationary base frame with the
cross laser.
Beissbarth GmbH