Herunterladen Diese Seite drucken

Beta 1893/1234YF Bedienungsanleitung Seite 22

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 44
OPERATION MANUAL AND INSTRUCTIONS
ISTRUZIONI PER L'USO
• Tare test.
• Refilling from an external cylinder.
• Setting LCD – Updating files.
- Info:
• Station model.
• Software version.
• Configuration.
Description of database:
- Brand.
- Model.
- Manufacturing year from-to.
- System type.
- Oil type and quantity in compressor.
- Amount of gas contained in system.
The values in the database are not binding; we accept no responsibility for any inaccuracies.
ANALYTICAL DESCRIPTION OF CYCLES
Manual cycle
Preliminary test: when the station is turned on, it is tested for defects and gas leaks for 30 seconds (initial test).
- Step 1: Recovering refrigerant gas from A/C system and automatically draining old oil.
• Open the high-pressure and low-pressure valves.
• Press the
key to select the -MANUAL- function; press the
• Press the
key to select the -RECOVERY- function; press the
• This will start the refrigerant gas recovery phase.
• After the recovery phase has been completed, the station will automatically check for refrigerant gas pockets in the A/C
system, and the display will show the recovered amount of refrigerant gas.
• After this test, the station will automatically drain old oil into its tank (see figure 4).
• If pressure increases during the test, the station will automatically recover any refrigerant gas pockets.
22
key.
key.
EN
I

Werbung

loading