Herunterladen Inhalt Inhalt Diese Seite drucken

Schneider Airsystems BAM 300-10-50 W Original Bedienungsanleitung Seite 8

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 21
GB
BAM 300-10-50 W
09
Condensate drain valve
10
Pressure switch with ON/OFF switch
11
Safety valve
12
Pressure gauge (vessel pressure)
13
Pressure gauge (working pressure)
14
Electric motor
15
External protective motor switch
18
Filter pressure reducer
19
Quick-action coupling (clean, regu-
lated compressed air)
1.6
Maintenance
1.6.1 Cleaning the intake filter
1. Unscrew the intake filter. (Fig. 5a)
2. Clean the filter insert using the blow gun,
exchange the filter insert if necessary.
3. Screw the intake filter back on.
I/4
1.7
Compressor inspections
This compressor is subject to a type approval
inspection. As a result, inspections by an au-
thorised expert prior to commissioning are
no longer necessary. The prototype identi-
fication code is located on the compressor
specification plate.
We recommend that a "qualified person"
perform a pressure test on the vessel after
10 years, depending on general levels of
wear and tear.
A "qualified person" should be well informed
about Ordinance on Industrial Safety and
Health (formerly authorised expert)
Contact any of our approved service part-
ners. Most of our service partners have em-
ployees with expert qualifications.
The papers accompanying the vessel are
approval documents and must be kept
throughout the service life of the vessel.
These specifications only apply in Germa-
ny. Equivalent regulations apply in other
countries.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

A 111 004

Inhaltsverzeichnis