Herunterladen Inhalt Inhalt Diese Seite drucken

Schneider Airsystems CPM 250-10-12 W Original Bedienungsanleitung Seite 8

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 21
GB
CPM 250-10-12 W
11
Safety valve
12
Pressure gauge (vessel pressure)
13
Pressure gauge (working pressure)
14
Electric motor
15
External protective motor switch
18
Filter pressure reducer
19
Quick-action coupling (clean, regu-
lated compressed air)
20
Mist oiler
21
Quick-action coupling (oil-mist com-
pressed air)
1.6
Transport
This tool may also be transported horizon-
tally.
1.7
Maintenance
1.7.1 Cleaning the intake filter
1. Remove the filter insert cover.
2. Pull out the filter insert. (Fig. 5a)
3. Clean the filter insert using the blow gun,
exchange the filter insert if necessary.
4. Insert the filter insert, push the cover
shut.
I/4
1.8
Compressor inspections
Special inspections are not required for this
compressor.
We recommend that a "qualified person" per-
form a pressure test on the vessel after 10
years, depending on general levels of wear
and tear.
A "qualified person" should be well informed
about Ordinance on Industrial Safety and
Health (formerly authorised expert)
Contact any of our approved service part-
ners. Most of our service partners have em-
ployees with expert qualifications.
The papers accompanying the vessel are
approval documents and must be kept
throughout the service life of the vessel.
These specifications only apply in Germa-
ny. Equivalent regulations apply in other
countries.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

A 222 006

Inhaltsverzeichnis