Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting The In-Line Electrolytic Cell To The Power Supply; Connecting The Flow Switch To The Cell Housing - Davey EcoSalt 2 DES2-15E Installation Und Betrieb

Vorschau ausblenden Andere Handbücher für EcoSalt 2 DES2-15E:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 33
INSTALLING THE CELL
The EcoSalt2 cell should always by the last appliance in your system. Ensure the cell is installed after pumps,
filters and any heating appliances. To achieve best efficiency, the EcoSalt2 cell should be installed such that
turbulent water is limited as much as possible. Do not install a 90° elbow closer that 200mm (8") from the cell's
inlet barrel union. Isolation valves used where equipment is located below pool water level, should also be
installed no closer than 200mm (8") from inlet barrel union. This will assist laminar flow. Allow a minimum of
25mm (an inch) between the cell housing and any (and all) walls, for easier cell removal when servicing. The
cell installation shall be restricted to outdoor locations in order to reduce the risk of gas accumulation.

CONNECTING THE IN-LINE ELECTROLYTIC CELL TO THE POWER SUPPLY

The EcoSalt2 salt water sanitiser uses a reverse polarity in-line electrolytic cell for low maintenance
operation. The EcoSalt2 power supply is fitted with a flexible lead terminated with the cell connectors
built into a plastic moulding. The three in-line connectors are not "polarity sensitive". Depending on the
installation, it may be necessary to support the cell housing underneath, by hand.
NOTE: The EcoSalt2 cell is supplied with a paddle type flow switch, which is to be installed on the
cell as shown in the diagram on page 4 and connected to the cell lead via the connector on the end
of the cable.
WARNING: The flow switch must be mounted with the highlighted arrow on side of the
switch pointing in the direction of flow.

CONNECTING THE FLOW SWITCH TO THE CELL HOUSING

Ensure that the flow switch is installed into the cell housing.
Ensure the flow switch direction is correct (see page 4)
Fitted
7

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis