Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Scope Of Delivery; Before Commissioning - ersa EASY ARM 1 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für EASY ARM 1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Commissioning

5.
Commissioning
5.1

Scope of Delivery

Please check the package contents for completeness and integrity. If any components are
damaged or incomplete please immediately contact your supplier.
The scope of delivery includes:
5.2

Before Commissioning

Ersa EASY ARM 1
Solder fume extraction EASY ARM 1
Mains cable
Pre-filter & combination filter
These operating instructions.
Take the solder fume extraction device out of the packaging and remove
any protective film completely.
Carry the extraction device using the handles and place it vertical and
with air intake at the top at the desired location.
Connect the device with the power cord to a suitable power supply.
Put the combination filter and pre-filter into the device (see Chapter 8).
Connect a suitable extraction arm to the extraction nozzle.
Apply a suitable nozzle to the extraction arm.
Switch on the device.
3BA00216 • 2023-02-17 • Rev. 3
23

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis