Herunterladen Inhalt Inhalt Diese Seite drucken

Scope Of Delivery; Installation; Unpacking The Machine; Setting Up The Machine - Würth ORSY mat DR Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Item
Description
1
Master module incl . control
2
Barcode scanner incl . USB cable
3
Key for drawer/emergency unlocking
4
Covering panel for the underside of the body
5
Mobile radio antenna
6
Power adaptor (12 V/DC)
7
Test report of body
8
Lacon test report
9
IEC connector
10
Glass layer slides for grip
(number may vary depending on the number of drawers)
Item
Description
1
Satellite module
2
Key for drawer/emergency unlocking
3
Covering panel for the underside of the body
4
CAN cable (already connected)
5
Power adaptor (12 V/DC)
6
Test report of body
7
Lacon test report
8
IEC connector
9
Glass layer slides for grip
(number may vary depending on the number of drawers)
The installation and the subsequent maintenance work must be carried out by a qualified technician, who is
familiar with the machine and its safety .

4.1 Unpacking the machine

After removing the packaging, check whether the machine is intact . In case of any doubt, do not use the
machine . The packaging materials should be disposed of by authorized specialized companies and used
further .

4.2 Setting up the machine

Do not set up the machine outdoors, rather set it up in closed spaces with temperature between 5°C and
34°C . The relative humidity should not exceed 65% .
Do not install it in areas, where water jets are used for cleaning purposes. The vending machine should also
not be exposed to any liquid mists and liquid vapours .
24
3 SCOPE OF DELIVERY
Master module
Satellite module
4 INSTALLATION
Quantity
1
1
2
2
1
1
1
1
1
X
Quantity
1
2
2
1
1
1
1
1
X

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Würth ORSY mat DR

Inhaltsverzeichnis