Herunterladen Inhalt Inhalt Diese Seite drucken

Preparation For Operation - hillvert HT-IRI-01 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
1 - Test spindle
2 - Rainfall adjustment cap
3 - Universal mounting bracket
4 - Sensor cord

3.2. Preparation for operation

POSITIONING OF THE UNIT
The device should be installed within an open space. Access to natural
environmental conditions should be provided: to sunlight and rainfall. Protect the
sensor against sprays and water flowing from the roof of the building. It is
recommended to place the device on drainpipes or on the edge of the roof.
ASSEMBLY OF THE UNIT
The sensor should me mounted as close to the controller as possible. Place the
device's mounting bracket at the edge of installation (2) and tighten it with the
screw (1).

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis